• Commence Scenery

    Commence Scenery

    Initial scenery layer

  • Commence Module Construction

    Commence Module Construction

  • Track risers

    Track risers

    Paper Templating

  • Track Elevations in place

    Track Elevations in place

    Foam Fillers

  • Commence Track Laying

    Commence Track Laying

    Indoors out of the weather

  • Scenery and Tunnel Access

    Scenery and Tunnel Access

    Cleaning Access is important

  • Flathead River

    Flathead River

    Fresh water from melting snow

Whitefish Overview

Whitefish Layout. HO Scale. DCC Operated, including point switches and signalling

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

    Edgemont

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

    Scenery detail

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

    Accidents happen!

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

    Bridges

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

    Deadwood

  • Mystic & Oblivion (M&O)

    Mystic & Oblivion (M&O)

    Early morning run

Mystic & Oblivion (M&O) Overview

Mystic & Oblivion (M&O). N Scale. DCC Operated.

  • Chadderton Signal Box

    Chadderton Signal Box

    Chadderton Signal Box

  • Chadderton Freight Unloading

    Chadderton Freight Unloading

    Chadderton Freight Unloading

  • Chadderton Bridge

    Chadderton Bridge

    Chadderton Bridge

  • Chadderton Lead up To Portal

    Chadderton Lead up To Portal

    Chadderton Lead up To Portal

  • Chadderton Portal Entry and Ruins

    Chadderton Portal Entry and Ruins

    Chadderton Portal Entry and Ruins

  • Chadderton

    Chadderton

    Demo of Construction Stages

  • Chadderton

    Chadderton

  • Bridge Approach – South End, lower level

  • Steam Power – South West, Lower Level

  • N Scale Bridges – South End, Lower Level

  • South end – lower level

  • South East Corner

  • South West Corner

  • Club N Scale

  • Cityscape

    Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Club N Inside Loop

  • Club N Inside Loop – South

  • Club N Inside Loop – SouthEast

  • Club N Outside Loop – South

  • Club N Construction

  • Club N Construction

  • Club N Construction

  • Leaving Cresson Eastbound

Club Layout, N Scale

Club Layout, N Scale. Large 240 metres or around 38 scale kilometres, two level, helix connected. N Scale. Single DC track, all others DCC operated.

  • Station

    Station [HO]

    Station

  • Stuart Town

    Non-stop past town

  • Diesel passing Station

    (good scenery transition)

  • First Run on Outer East

  • Inner West Run

    (adding more scenery)

  • Flour Mills

  • Passing through town

  • Station

    (Ballast to be laid)

  • Steel Bridge

  • Industry

  • Construction

  • Construction

Club Layout, HO Scale

Club Layout, HO Scale. Very Large, two tier connected via a helix. DCC (Digitrax System) Operated.